Monday, July 14, 2014

Blog-Ality Home Makeover 2

Whew! First week of the renovation process is complete. That first day was a big change with everything being demoed. After that it sort of slowed down with little projects each day being started or finished.

Then began the agonizingly slow process of getting the tile grout up from the cement. They tried chipping it, they tried sanding it, then they decided to grind it down. Each taking a day at least. It's all off now. But everything is covered in a fine layer of dust despite the plastic seal they are using.

The next project was what will be forever known as the "Firewall." We have 17 foot cathedral ceilings with oversized windows on either side of the fireplace. Decided that would be a cool accent wall and bought some stacked stone:





They needed scaffolding to reach the top most peak. Little did I know how much I would come to hate that scaffolding. But the wall turned out amazing. It absolutely defines the space {HGTV speak for WOW Factor}.



We asked them to leave the {dreaded} scaffolding to save us the cost of renting our own so that we could paint the sloping ceiling and the support beam ourselves. Boy, oh boy. That not a day of fun.



Five hours with a 12 foot extender pole and a roller. I was completely covered in 'parmesan' paint. Then another four hours to paint the beam to mimic an exposed beam.



What a week!





No comments: